Honister & Hewitt Tower - Reading
Replace all combustible materials with A1/A2 certified non-combustible Materials. Scope consisting of:
remove, store & re-install external Rainscreen Panels
replace Breather Membrane
replace PIR Insulation
replace Firebarriers
replace EWI (external solid wall insulation) Render
replace Balcony Decking Boards
remove, temporarily replant Tree's and reinstate at Project end
Albert Embankment - London
Replace all combustible materials with A1-s1,d0 / A2-s1,d0 certified non-combustible materials to achieve EWS1 certification.
Full scope encompassing 3 fully occupied Tower blocks:
removal of all combustible materials in external wall built-up
remove, store temporarily and re-install Terracotta - Tiles
Install Vertical- and Horizontal "Siderise" Fire barriers
replace Timber Balcony decking with compliant
replace "CP Boards" & Breather membrane
replace Copper-Cladding incl substructure
Block A Copper Cladding & Balconies
Write a description
Block C: Access Scaffold - last Levels ready for removal
Write a description
Balcony removal in tight space
Write a description
3D Model created to enable exact Logistics planning
3D model created (based on BIM Models) to allow planning and visualising each step of construction and also to visually communicate with residents
Central Park - Brighton
-
Central Park
ButtonWrite a description
-
First Panel removed
ButtonWrite a description
-
San Francisco
Buttonwe believe workmanship problems can only be elimated through through visualisation, showing each intricate detail clearly and understandibly for any Operative
-
Design contributing to harmonious problem free installation
ButtonWrite a description